IEC provides comprehensive turnkey support across all project phases, from initial feasibility studies and conceptual design to full-scale construction and commissioning. We leverage integrated in-house expertise across multiple disciplines, integrating decades of operational experience with forward-thinking design to bridge the gap between complex energy challenges and real-world results.

Project Lifecycle Activities

IEC PROJECT LIFECYCLE V2

Project Lifecycle

Built for Real-World Results

Pre-Project
Planning & site
evaluation
Environmental impact
studies
Initial process modeling
& layout
Conceptual Design
Technology selection
Risk and cost
analysis
Civil, electrical, and
mechanical groundwork
Detailed Design
Full system architecture
(P&IDs, C&ID diagrams)
Control logic, software
integration
3D modeling, structural and
piping analysis
Erection & Commissioning
Site support and
supervision
System validation
and testing
Start-up, troubleshooting,
and performance
optimization

Why Us

Integrated In-House Expertise

Integrated In-House Expertise

Full-spectrum design: process, electrical, control, and civil Centralized project management and digital coordination Built-in flexibility: up to 30% outsourcing without losing core control
Technical Standards & Certifications

Technical Standards & Certifications

ASME-compliant piping systems
Certified gas system engineers (DVGW, IS 6464)
ISO 9001-certified quality systems

Strategic Strengths

Strategic Strengths

Advanced modeling and simulation tools
Custom designs optimized for lifecycle cost (LCC)
Unique solutions for operational and environmental stress scenarios
Proven innovation in compact and high-efficiency layouts
Cross-border business development capabilities

In House Engineering Services

ISRAEL ELECTRIC 400 300 ה

  • Conceptual design
  • Techno Economical Analysis
  • Detail design
  • Project Management
  • Mechanical & Process design
  • Electrical & controls design
  • Instrumentation
  • Civil Design

End-to-End Engineering
& Consulting Services

ISRAEL ELECTRIC 400 300 ה

  • Feasibility and technical studies
  • Environmental and topographic surveys
  • Life cycle cost assessments
  • Specification development (EPC and equipment)
  • Tendering, bid evaluations, and contract management
  • Detailed multidisciplinary design
  • Construction and commissioning oversight

Premium Expertise

eng1706

Engineering Specializations

Electro-Mechanical Systems

ISRAEL ELECTRIC 400 300 ה

  • High-voltage procurement, transformer design, and busbars
  • 3D engineering with
    E3D software
  • Complete cabling, grounding, and lightning protection systems

Electrical and Control

ISRAEL ELECTRIC 400 300 ה

  • From RFI prep to commissioning
  • ETAP, COMOS, AutoCAD modeling
  • Switchgear, MCCs, essential AC/DC systems
  • PLC-based controls, SCADA, and laboratory testing

Fire & Safety Systems

ISRAEL ELECTRIC 400 300 ה

  • Integrated fire protection:
    from lab tests to on-site safety approvals
  • Lighting systems: design, procurement, and full implementation

Global Reach Projects

Our portfolio includes a diverse range of projects spanning multiple sectors, with a global reach.

Full-Service Expertise

Combined Cycle

ISRAEL ELECTRIC 400 300 ה

Coal to NG Conversion

ISRAEL ELECTRIC 400 300 ה

Emission Reduction

ISRAEL ELECTRIC 400 300 ה

Open Cycle GT

ISRAEL ELECTRIC 400 300 ה